logo

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Customized Connectors
Created with Pixso.

CNC PEEK Insulator High Density Circular Connector 26 Pin Odm

CNC PEEK Insulator High Density Circular Connector 26 Pin Odm

Brand Name: BEXKOM
Model Number: BK-C-XXX
MOQ: 5pcs
Price: USD1.5~2.9/pc
Payment Terms: T/T, L/C
Supply Ability: 100000pairs/month
Detail Information
Place of Origin:
China
Certification:
UL/CE/ROHS/REACH/ISO9001/ISO13485/MSDS/COC
Design Fee:
Free
Desgn Term:
1 Weeks
Drawings:
Available
Sample:
Available
Material:
PEEK
Contact Number:
3,5,7
Mate Cycle:
5000
Packaging Details:
PE bag + Carton Box
Supply Ability:
100000pairs/month
Highlight:

26 Pin high density circular connector

,

PEEK high density circular connector

,

odm 26 pin circular connector

Product Description

Customizing a product for customers within a 1 to 4-week timeframe involves several key steps to ensure the product meets the desired specifications and quality standards. Here’s a structured approach to achieve this:

Steps to Customize a Product Quickly

  1. Initial Consultation and Requirements Gathering (1-2 Days):

    • Discuss Requirements: Engage with the customer to understand their specific needs, including technical specifications, design preferences, and application requirements.
    • Define Scope: Clearly outline the scope of the customization, including features, dimensions, materials, and any special considerations.
  2. Design and Engineering (3-7 Days):

    • Concept Design: Create initial design concepts based on the gathered requirements. This may include sketches, CAD models, or prototypes.
    • Design Review: Share the designs with the customer for feedback and approval. Make necessary adjustments based on their input.
    • Engineering Validation: Ensure that the design meets all functional, mechanical, and safety requirements. Perform any necessary simulations or tests.
  3. Prototyping (3-7 Days):

    • Prototype Development: Build a prototype based on the approved design. This could be a 3D-printed model, a small-batch production sample, or a fully functional prototype.
    • Testing and Evaluation: Test the prototype to verify that it meets all specifications and performs as expected. Address any issues or adjustments needed.
  4. Production Preparation (2-4 Days):

    • Finalize Design: Incorporate any final changes from the prototype testing phase.
    • Prepare for Production: Set up manufacturing processes, including sourcing materials, setting up molds or tooling, and planning production schedules.
  5. Production and Quality Assurance (5-10 Days):

    • Manufacturing: Begin production of the customized product. Depending on the complexity, this could involve assembly, machining, or other processes.
    • Quality Control: Implement quality control checks throughout the production process to ensure that the final product meets all specifications and standards.
  6. Delivery and Support (1-2 Days):

    • Packaging and Shipping: Prepare the product for shipping, ensuring it is securely packaged to prevent damage during transit.
    • Customer Support: Provide any necessary documentation, support, or training to the customer for the product.

Key Considerations:

  • Clear Communication: Maintain open and clear communication with the customer throughout the process to ensure their requirements are fully understood and met.
  • Rapid Prototyping: Utilize fast prototyping methods, such as 3D printing or CNC machining, to expedite the design verification process.
  • Flexible Manufacturing: Choose manufacturing partners and processes that can accommodate rapid production timelines without sacrificing quality.
  • Efficient Project Management: Implement effective project management practices to keep the project on schedule and address any issues promptly.

Typical Lead Times:

  • Simple Products: For straightforward customizations, a lead time of 1-2 weeks may be sufficient.
  • Complex Products: More complex designs or products may require closer to 3-4 weeks, depending on the complexity and manufacturing requirements.

By following this structured approach, you can efficiently customize a product to meet your customer’s needs within a 1 to 4-week timeframe, ensuring both timely delivery and high-quality results.

 

CNC PEEK Insulator High Density Circular Connector 26 Pin Odm 0